Pipe Color Coding — ASME A13.1
The six fixed colour combinations, the four user-defined ones, and the legend and letter size required at every pipe diameter.
The six fixed colour combinations
This is the scheme of ASME A13.1-2023. It classifies mostly by hazard, not by fluid: what determines the colour is what the contents would do if they escaped, which is why hot oil and natural gas do not each get a colour of their own.
| Contents | Marker | Legend colour | Field colour |
|---|---|---|---|
| Fire-quenching fluids | Red White legend | White | Red |
| Toxic and corrosive fluids | Orange Black legend | Black | Orange |
| Flammable, combustible and oxidizing fluids | Yellow Black legend | Black | Yellow |
| Steam, steam condensate, boiler feed water and other hot water | Gray Black legend | Black | Gray |
| Potable, cooling and other cold or tepid water | Green White legend | White | Green |
| Compressed air | Blue White legend | White | Blue |
Colours shown are indicative on screen only. Specify marker stock against the standard, not against this page.
The four user-defined combinations
These carry no assigned meaning. If a site uses them it must document what they mean and post the key where the pipes are — an undocumented purple line tells a stranger nothing.
| Contents | Marker | Legend colour | Field colour |
|---|---|---|---|
| User defined | Purple White legend | White | Purple |
| User defined | White Black legend | Black | White |
| User defined | Brown White legend | White | Brown |
| User defined | Black White legend | White | Black |
What changed from the 2020 edition
Markers bought before 2023 follow an older scheme, and both are in service. In the 2015 and 2020 editions:
- combustible fluids had their own colour, white on brown; they are now black on yellow with the flammable fluids;
- green covered every kind of water, including boiler feed water; hot water and boiler feed are now black on gray;
- steam had no colour of its own; it is now black on gray;
- the user-defined colours were purple, black, white and gray, the gray with white lettering; they are now purple, white, brown and black.
Marker size
The size of the colour field and the letter height both follow the pipe diameter, so a marker legible on a 2 in line is not compliant on a 12 in header.
| Pipe outside diameter | Length of colour field | Letter height |
|---|---|---|
| 0.7 – 1.3 in | 8 in | 0.5 in |
| 1.4 – 2.4 in | 8 in | 0.7 in |
| 2.5 – 6.7 in | 12 in | 1.3 in |
| 6.8 – 10.0 in | 24 in | 2.5 in |
| Over 10 in | 32 in | 3.5 in |
The standard states these against the outside diameter of the pipe or its covering. An insulated line is sized on the lagging, not the pipe, so it often moves up a band.
Marker size by pipe size
The same table applied to every ASME B36.10M size, with the outside diameter alongside so an insulated line can be checked against the band above.
Dimensions are given in inches, with the millimetre equivalent beneath in grey.
| Size | Outside diameter | Colour field length | Letter height |
|---|---|---|---|
| NPS 1/8 | 0.40510.29 mm | tag instead | — |
| NPS 1/4 | 0.54013.72 mm | tag instead | — |
| NPS 3/8 | 0.67517.14 mm | tag instead | — |
| NPS 1/2 | 0.84021.34 mm | 8 in | 0.5 in |
| NPS 3/4 | 1.05026.67 mm | 8 in | 0.5 in |
| NPS 1 | 1.31533.40 mm | 8 in | 0.5 in |
| NPS 1 1/4 | 1.66042.16 mm | 8 in | 0.7 in |
| NPS 1 1/2 | 1.90048.26 mm | 8 in | 0.7 in |
| NPS 2 | 2.37560.32 mm | 8 in | 0.7 in |
| NPS 2 1/2 | 2.87573.02 mm | 12 in | 1.3 in |
| NPS 3 | 3.50088.90 mm | 12 in | 1.3 in |
| NPS 3 1/2 | 4.000101.60 mm | 12 in | 1.3 in |
| NPS 4 | 4.500114.30 mm | 12 in | 1.3 in |
| NPS 5 | 5.563141.30 mm | 12 in | 1.3 in |
| NPS 6 | 6.625168.27 mm | 12 in | 1.3 in |
| NPS 8 | 8.625219.07 mm | 24 in | 2.5 in |
| NPS 10 | 10.750273.05 mm | 32 in | 3.5 in |
| NPS 12 | 12.750323.85 mm | 32 in | 3.5 in |
| NPS 14 | 14.000355.60 mm | 32 in | 3.5 in |
| NPS 16 | 16.000406.40 mm | 32 in | 3.5 in |
| NPS 18 | 18.000457.20 mm | 32 in | 3.5 in |
| NPS 20 | 20.000508.00 mm | 32 in | 3.5 in |
| NPS 22 | 22.000558.80 mm | 32 in | 3.5 in |
| NPS 24 | 24.000609.60 mm | 32 in | 3.5 in |
| NPS 26 | 26.000660.40 mm | 32 in | 3.5 in |
| NPS 28 | 28.000711.20 mm | 32 in | 3.5 in |
| NPS 30 | 30.000762.00 mm | 32 in | 3.5 in |
| NPS 32 | 32.000812.80 mm | 32 in | 3.5 in |
| NPS 34 | 34.000863.60 mm | 32 in | 3.5 in |
| NPS 36 | 36.000914.40 mm | 32 in | 3.5 in |
The band is chosen from the outside diameter, not from the NPS number, so NPS 10, which is 10.750 in across, takes the largest marker. NPS 1/8, 1/4 and 3/8 are below 0.7 in across, where the standard gives no field size and recommends a permanently attached tag.
Colour is not the identification. Every A13.1 marker needs the legend in words and an arrow for flow direction. Colour classifies the hazard; the words identify the line. Bidirectional lines get arrows both ways.
Guides and comparisons for this page
Common questions
What do the ASME A13.1 pipe colours mean?
In the 2023 edition six colour combinations are fixed. Red with white lettering is fire-quenching; orange with black is toxic or corrosive; yellow with black is flammable, combustible or oxidizing; gray with black is steam and hot water; green with white is cold water; blue with white is compressed air. Four further combinations — purple, white, brown and black fields — are left for the user to define.
Did the colours change in 2023?
Yes. In the 2015 and 2020 editions brown with white lettering meant combustible fluids, green covered all water including boiler feed, and gray was one of the user-defined colours. The 2023 edition moved combustible fluids into yellow, gave gray to steam and hot water, and made brown user-defined. Markers to the older scheme are still widely installed, so check which edition a site works to.
Is the colour enough on its own?
No. A13.1 requires the legend — the name of the contents in words — plus an arrow showing flow direction. The colour field is there to make the hazard class readable from a distance; the words are what identify the line. A pipe marked only by colour does not comply.
How often do markers have to be repeated?
A13.1 asks for markers wherever the line is read: at valves and flanges, at changes of direction, on both sides of a wall, floor or ceiling penetration, at entry and exit points, and at intervals on long straight runs — commonly taken as every 25 to 50 ft. Place them so a marker is visible from the normal approach to the pipe.
Does A13.1 apply outside the United States?
No. A13.1 is a US voluntary standard, adopted by reference in many specifications and by OSHA in practice rather than by rule. The UK and much of Europe use BS 1710 and its EN companions, which have a different and incompatible colour scheme — green for water there too, but the rest does not map across. Marine and shipbuilding practice differs again.